Find a dealer
The AA
The AA
  • Used Cars
    Back Used Cars
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Audi
      • BMW
      • Citroen
      • Ford
      • Hyundai
      • Jaguar
      • Kia
      • Land Rover
      • Mercedes
      • MINI
      • Nissan
      • Peugeot
      • Porsche
      • Renault
      • Skoda
      • Toyota
      • Vauxhall
      • Volkswagen
      • Volvo
      • Browse by manufacturer
      • Search all used cars
    • Browse by Model
      Back Browse by Model
      • Audi A1
      • Audi A3
      • Audi Q5
      • BMW 3 Series
      • Fiat 500
      • Ford Fiesta
      • Ford Focus
      • Ford Kuga
      • Kia Sportage
      • Mercedes A Class
      • Mercedes C Class
      • MINI Hatch
      • Nissan Juke
      • Nissan Qashqai
      • Peugeot 208
      • Range Rover Evoque
      • Toyota Yaris
      • Vauxhall Astra
      • Vauxhall Corsa
      • Vauxhall Mokka
      • Volkswagen Golf
      • Volkswagen Polo
      • Volkswagen Tiguan
      • Search all used cars
    • Browse by Location
      Back Browse by Location
      • Birmingham
      • Bristol
      • Cardiff
      • Doncaster
      • Edinburgh
      • Glasgow
      • Hull
      • Leeds
      • Leicester
      • Liverpool
      • London
      • Manchester
      • Newcastle
      • Norwich
      • Nottingham
      • Portsmouth
      • Reading
      • Sheffield
      • Southampton
      • Swindon
      • All locations
    • Browse by Body style
      Back Browse by Body style
      • SUVs
      • 7 Seaters
      • Sports cars
      • 4x4
      • Estates
      • Hatchbacks
      • Motorhomes
      • Family cars
      • Convertibles
      • Coupes
      • Saloons
      • Luxury cars
      • People carriers
      • City cars
      • Superminis
      • Supercars
      • Executive cars
      • All bodystyles
    • Browse by Fuel type
      Back Browse by Fuel type
      • Used diesel cars
      • Used electric cars
      • Used hybrid cars
      • Used petrol cars
      • Used plug-in hybrid cars
    • Browse by Transmission
      Back Browse by Transmission
      • Used automatic cars
      • Used manual cars
    • Browse by Maximum price
      Back Browse by Maximum price
      • Used cars under £30,000
      • Used cars under £20,000
      • Used cars under £15,000
      • Used cars under £10,000
      • Used cars under £5,000
      • Used cars under £4,000
      • Used cars under £3,000
      • Used cars under £2,000
      • Used cars under £1,000
    • Buying advice
      Back Buying advice
      • Best used 4x4 cars
      • Best used 7-seater cars
      • Best used electric cars
      • Best used estate cars
      • Best used family cars
      • Best used first cars
      • Best used fuel efficient cars
      • Best used hybrid cars
      • Best used second-hand cars
      • Best used small cars
      • Best used sports cars
      • Best used SUV cars
    • Car checks and delivery
      Back Car checks and delivery
      • Used vehicle inspection
      • Car history check
      • Vehicle delivery
  • Used Vans
    Back Used Vans
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Citroen
      • Fiat
      • Ford
      • Isuzu
      • Iveco
      • Mercedes
      • Mitsubishi
      • Nissan
      • Peugeot
      • Renault
      • Toyota
      • Vauxhall
      • Volkswagen
      • Search all used vans
    • Browse by Model
      Back Browse by Model
      • Citroen Dispatch
      • Citroen Relay
      • Ford Ranger
      • Ford Transit
      • Ford Transit Connect
      • Mercedes Sprinter
      • Mercedes Vito
      • Mitsubishi l200
      • Nissan Navara
      • Peugeot Boxer
      • Peugeot Expert
      • Peugeot Partner
      • Renault Kangoo
      • Renault Trafic
      • Toyota Hi Lux
      • Vauxhall Combo
      • Vauxhall Movano
      • Vauxhall Vivaro
      • Volkswagen Caddy
      • Volkswagen Crafter
      • Volkswagen Transporter
      • Search all used vans
    • Van checks and delivery
      Back Van checks and delivery
      • Used vehicle inspection
      • Van history check
      • Vehicle delivery
  • Finance
    Back Finance
    • Car finance
    • Car finance calculator
    • Eligibility checker
    • Car finance explained
    • PCP car finance
    • HP car finance
    • Car loans
  • Leasing
    Back Leasing
    • Car leasing
      Back Car leasing
      • All car leasing
        • Search by make
        • Fiat
        • Hyundai
        • Nissan
        • Skoda
        • Vauxhall
        • Volkswagen
        • Search by type
        • Electric
        • Hybrid
        • Automatic
        • SUV
        • Hatchback
        • Estate
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Van leasing
      Back Van leasing
      • All van leasing
        • Search by make
        • Ford
        • Mercedes
        • Nissan
        • Peugeot
        • Renault
        • Volkswagen
        • Search by type
        • Luton vans
        • Crew vans
        • Pick-up vans
        • Tipper vans
        • Dropside vans
        • High-roof vans
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Business leasing
      Back Business leasing
      • All business leasing
    • Help and guides
      Back Help and guides
        • Leasing guides
        • How AA Lease works
        • What is a car lease
        • Pros and cons of leasing
        • Common lease misbeliefs
        • Returning your lease vehicle
        • View all leasing guides
        • Help
        • FAQs
        • Contact us
  • Sell
    Back Sell
    • Sell my car
    • Sell my van
    • Value my car
  • Aftercare
    Back Aftercare
    • Car warranty
    • Breakdown cover
    • Car insurance
    • Car servicing
    • MOT
    • Car smart care
  • Advice
    Back Advice
    • Buying a used car online
    • Car reviews
    • Buyers guides
    • Best cars
    • Driving advice
  • Your account
  • Find a dealer
This car is no longer available

Other recommendations

Mercedes GL Class C 200 AMG LINE PREMIUM

Mercedes GL Class C 200 AMG LINE PREMIUM

View
£16,995
Mercedes GL Class C180 KOMPRESSOR BLUEEFFICIENCY SPORT

Mercedes GL Class C180 KOMPRESSOR BLUEEFFICIENCY SPORT

View
£2,499
Mercedes GL Class C250 D AMG LINE PREMIUM PLUS

Mercedes GL Class C250 D AMG LINE PREMIUM PLUS

View
£9,995
Mercedes GL Class C350 E SPORT

Mercedes GL Class C350 E SPORT

View
£13,999

Sold vehicle details

£42,537

Mercedes-BenzGLE 300d 4Matic AMG Line Prem + 5dr 9G-Tron [7 St] Diesel Estate

Contact the dealer

Mercedes-Benz of Ascot

01344 264 143*
View all stock at this dealer
* Calls may be recorded for training and monitoring purposes. Please refrain from providing credit/debit card information on these calls. If you do so it is at your own risk.
This dealer has committed to AA Cars Standards | tsi APPROVED CODE™ tradingstandards.uk

Overview

  • Mileage:
    34,240
  • Year:
    2021
  • Fuel type: Diesel
  • Transmission: Automatic
  • Body type: Estate
  • Colour: Obsidian black metallic
  • Doors: 5
  • Engine size: 2.0 L
  • CO2 Emissions: 212 g/km

Please note: Dealers are responsible for the content of their listings and are expected to include all fees in the advertised price. You should always confirm all listing details with the dealer before purchasing.

Vehicle details

Mercedes-Benz GLE 300d 4Matic AMG Line Prem + 5dr 9G-Tron [7 St] Diesel Estate, , Get ready to experience luxury SUV motoring at its finest with this stunning 2021 Mercedes-Benz GLE 300d 4MATIC AMG Line Premium Plus now available from Mercedes-Benz of Ascot.
Finished to the highest standard and boasting just 34,240 miles, this GLE is as sophisticated as it is capable. The Premium Plus specification brings together cutting-edge technology, indulgent comfort, and uncompromising safety making every journey feel first class.
Lets start with the 360 Camera, giving you a birds eye view of your surroundings for effortless parking and tight manoeuvres. Combine that with Active Parking Assist with PARKTRONIC, and this car practically parks itself.
Slide open the Panoramic Sliding Sunroof to flood the cabin with light, while you relax into Electrically Adjustable Memory Front Seats, heated for those chilly mornings. The Air Balance Package ensures the cabin stays fresh and fragrant, while Climate Control and Privacy Glass keep you cool and composed.
Music lovers will adore the Burmester Surround Sound System, offering crystal-clear audio, paired with Digital Radio for endless entertainment. And with 7 Seats and an 80-litre fuel tank, its perfect for long family adventures.
Safety? Covered. The Tyre Pressure Monitoring System keeps you informed, while 4MATIC all-wheel drive ensures confidence in all weather.
Buy with complete peace of mind from Mercedes-Benz Ascot, where every Approved Used vehicle comes with a comprehensive warranty, a full inspection by manufacturer-trained technicians, and outstanding customer service to match.
This GLE is more than an SUV its a statement. Come and see why its one of the most desirable premium SUVs on the market today.
Contact Mercedes-Benz of Ascot now to arrange your test drive.

Vehicle features

  • AMG floor mats with AMG lettering
  • Rear wiper
  • Adaptive Brake System with HOLD function and brake drying in the wet
  • Agility control suspension with selective damping system and lowered by 15mm
  • Hey Mercedes Voice activation
  • Direct Steer speed sensitive steering
  • ECO start/stop function
  • Status display for rear seat belts in instrument cluster
  • Exterior mirrors heated and electronically adjustable
  • Trim - Centre console
  • anthracite open pore oak wood trim
  • incorrect fuelling protection
  • Additional USB connection
  • 85 litre fuel tank
  • Multi beam LED headlights
  • Thermotronic automatic 4 zone climate control
  • Easy-pack tailgate - Powered opening/closing automatically
  • Interior lighting - 64 colour Ambient lighting
  • Mirror package - GLE
  • Drivers knee airbag
  • 4 way lumbar support
  • Alarm system/interior protection/immobiliser
  • Sunvisors with illuminated vanity mirrors
  • Summer tyres with noise reducing absorber
Remember to check the details of this car with the dealer before you buy it to make sure that all the information is accurate.

Vehicle history check

For LY70EVM

  • Icon - tick in circle Not recorded as stolen
  • Icon - tick in circle No third-party trace
  • Icon - tick in circle 0 previous keepers show

    The current keeper is not included in the number of previous keepers.

    This vehicle has had 1 registered keeper from new. Please note that the keeper is not necessarily the owner, it may be a company vehicle or belong to a third party.

  • Icon - tick in circle No plate changes
  • Icon - tick in circle No colour changes
  • Icon - tick in circle Mileage data available † show

    Source Date Mileage
    MOT 15/02/2025 30,382
    MOT 12/02/2024 23,961
  • Icon - tick in circle Not an insurance write-off
Data for this history check supplied: 06/09/2025 at 02:20

What's not included?

  • Icon - cross in circle Outstanding finance details
  • Icon - cross in circle Estimated cost of vehicle ownership
  • Icon - cross in circle MOT history & common failures*
  • Icon - cross in circle Full vehicle specification
  • Icon - cross in circle Mileage discrepancies*
  • Icon - cross in circle Market valuation*
  • Icon - cross in circle Vehicle Tax Check
*Provided where available

Get peace of mind with an instant full vehicle history check and uncover any potential issues before you buy.

Get this vehicle checked

Buy with the AA

This dealer is an AA approved franchise dealer.

Icon - vehicle with spanner

Get exclusive AA offers

12 months free breakdown cover (or discounted upgrade if you're an AA member) and £75 off a Service & MOT. T&Cs apply

Activate offers

12 months free breakdown cover

  • Included with this vehicle
  • Free Accident Assist service available 24/7
  • Already with the AA? Upgrade your cover for only £10 for the year^

Unlock your offers up to six months after buying one of our vehicles.

Activate cover ^T&C's apply

Get 10% off Car Insurance

Take out a quote today and we will automatically apply 10% discount.

Get a quote today T&C's apply
VERTU MOTORS

Sell My Car

Sell your car in 3 simple steps!

Value it, book it, sell it.

Sell My Car

Category write-offs

A vehicle that has been in an accident will be assessed by insurance companies and assigned a category: A, B, S or N. However, we only list Cat S or N cars as Cat A and B cars are not roadworthy and safe.

Category S (formerly Category C)

The 'S' in Cat S stands for structural damage. This means the vehicle has damage to its structure/chassis, which is more than just cosmetic damage. But the vehicle can be professionally repaired, making it safe and roadworthy.

Category N (formerly Category D)

Similarly, the 'N' in Cat N stands for non-structural damage. Here, the vehicle has sustained damage, but it has not affected the structure/chassis. A Cat N car is safe to drive as the damage could be minimal/cosmetic.

Buying a written-off vehicle:

  • Do a full vehicle history check to identify category vehicles.
  • Make sure to check with the dealer if a Cat S/N vehicle has been professionally repaired.
  • Book a vehicle inspection and our experts will look over a Category vehicle for you.

Connect with us

Facebook X YouTube LinkedIn
For customers
  • Customer terms & conditions
  • Our dealers
  • Motoring advice
  • Car delivery
  • Why AA Cars
  • Customer data request form
For dealers
  • Car dealer terms & conditions
  • AA Cars Standards code (trade)
  • Advertise with us
Other
  • Contact us
  • About us
  • Privacy notice
  • Cookie policy
  • Sitemap
Vehicle Inspections

The AA recommends an AA Cars Vehicle Inspection before purchase. Not all cars are mechanically checked by the AA.

  • Vehicle Inspection
  • theAA.com
© AA Cars 2025  | Company No. 4546950  |  VAT No. 188 0311 10