Find a dealer
The AA
The AA
  • Used Cars
    Back Used Cars
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Audi
      • BMW
      • Citroen
      • Ford
      • Hyundai
      • Jaguar
      • Kia
      • Land Rover
      • Mercedes
      • MINI
      • Nissan
      • Peugeot
      • Porsche
      • Renault
      • Skoda
      • Toyota
      • Vauxhall
      • Volkswagen
      • Volvo
      • Browse by manufacturer
      • Search all used cars
    • Browse by Model
      Back Browse by Model
      • Audi A1
      • Audi A3
      • Audi Q5
      • BMW 3 Series
      • Fiat 500
      • Ford Fiesta
      • Ford Focus
      • Ford Kuga
      • Kia Sportage
      • Mercedes A Class
      • Mercedes C Class
      • MINI Hatch
      • Nissan Juke
      • Nissan Qashqai
      • Peugeot 208
      • Range Rover Evoque
      • Toyota Yaris
      • Vauxhall Astra
      • Vauxhall Corsa
      • Vauxhall Mokka
      • Volkswagen Golf
      • Volkswagen Polo
      • Volkswagen Tiguan
      • Search all used cars
    • Browse by Location
      Back Browse by Location
      • Birmingham
      • Bristol
      • Cardiff
      • Doncaster
      • Edinburgh
      • Glasgow
      • Hull
      • Leeds
      • Leicester
      • Liverpool
      • London
      • Manchester
      • Newcastle
      • Norwich
      • Nottingham
      • Portsmouth
      • Reading
      • Sheffield
      • Southampton
      • Swindon
      • All locations
    • Browse by Body style
      Back Browse by Body style
      • SUVs
      • 7 Seaters
      • Sports cars
      • 4x4
      • Estates
      • Hatchbacks
      • Motorhomes
      • Family cars
      • Convertibles
      • Coupes
      • Saloons
      • Luxury cars
      • People carriers
      • City cars
      • Superminis
      • Supercars
      • Executive cars
      • All bodystyles
    • Browse by Fuel type
      Back Browse by Fuel type
      • Used diesel cars
      • Used electric cars
      • Used hybrid cars
      • Used petrol cars
      • Used plug-in hybrid cars
    • Browse by Transmission
      Back Browse by Transmission
      • Used automatic cars
      • Used manual cars
    • Browse by Maximum price
      Back Browse by Maximum price
      • Used cars under £30,000
      • Used cars under £20,000
      • Used cars under £15,000
      • Used cars under £10,000
      • Used cars under £5,000
      • Used cars under £4,000
      • Used cars under £3,000
      • Used cars under £2,000
      • Used cars under £1,000
    • Buying advice
      Back Buying advice
      • Best used 4x4 cars
      • Best used 7-seater cars
      • Best used electric cars
      • Best used estate cars
      • Best used family cars
      • Best used first cars
      • Best used fuel efficient cars
      • Best used hybrid cars
      • Best used second-hand cars
      • Best used small cars
      • Best used sports cars
      • Best used SUV cars
    • Car checks and delivery
      Back Car checks and delivery
      • Used vehicle inspection
      • Car history check
      • Vehicle delivery
  • Used Vans
    Back Used Vans
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Citroen
      • Fiat
      • Ford
      • Isuzu
      • Iveco
      • Mercedes
      • Mitsubishi
      • Nissan
      • Peugeot
      • Renault
      • Toyota
      • Vauxhall
      • Volkswagen
      • Search all used vans
    • Browse by Model
      Back Browse by Model
      • Citroen Dispatch
      • Citroen Relay
      • Ford Ranger
      • Ford Transit
      • Ford Transit Connect
      • Mercedes Sprinter
      • Mercedes Vito
      • Mitsubishi l200
      • Nissan Navara
      • Peugeot Boxer
      • Peugeot Expert
      • Peugeot Partner
      • Renault Kangoo
      • Renault Trafic
      • Toyota Hi Lux
      • Vauxhall Combo
      • Vauxhall Movano
      • Vauxhall Vivaro
      • Volkswagen Caddy
      • Volkswagen Crafter
      • Volkswagen Transporter
      • Search all used vans
    • Van checks and delivery
      Back Van checks and delivery
      • Used vehicle inspection
      • Van history check
      • Vehicle delivery
  • Finance
    Back Finance
    • Car finance
    • Car finance calculator
    • Eligibility checker
    • Car finance explained
    • PCP car finance
    • HP car finance
    • Car loans
  • Leasing
    Back Leasing
    • Car leasing
      Back Car leasing
      • All car leasing
        • Search by make
        • Fiat
        • Hyundai
        • Nissan
        • Skoda
        • Vauxhall
        • Volkswagen
        • Search by type
        • Electric
        • Hybrid
        • Automatic
        • SUV
        • Hatchback
        • Estate
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Van leasing
      Back Van leasing
      • All van leasing
        • Search by make
        • Ford
        • Mercedes
        • Nissan
        • Peugeot
        • Renault
        • Volkswagen
        • Search by type
        • Luton vans
        • Crew vans
        • Pick-up vans
        • Tipper vans
        • Dropside vans
        • High-roof vans
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Business leasing
      Back Business leasing
      • All business leasing
    • Help and guides
      Back Help and guides
        • Leasing guides
        • How AA Lease works
        • What is a car lease
        • Pros and cons of leasing
        • Common lease misbeliefs
        • Returning your lease vehicle
        • View all leasing guides
        • Help
        • FAQs
        • Contact us
  • Sell
    Back Sell
    • Sell my car
    • Sell my van
    • Value my car
  • Aftercare
    Back Aftercare
    • Car warranty
    • Breakdown cover
    • Car insurance
    • Car servicing
    • MOT
    • Car smart care
  • Advice
    Back Advice
    • Buying a used car online
    • Car reviews
    • Buyers guides
    • Best cars
    • Driving advice
  • Your account
  • Find a dealer
This car is no longer available

Other recommendations

Volkswagen Golf 1.5 TSI EVO Match 5dr

Volkswagen Golf 1.5 TSI EVO Match 5dr

View
£13,686
Volkswagen Golf 1.4 TSI GTE 5dr DSG

Volkswagen Golf GTE 1.4 TSI GTE 5dr DSG

View
£19,799
Volkswagen Golf 1.5 TSI 150 Match 5dr

Volkswagen Golf 1.5 TSI 150 Match 5dr

View
£22,999
Volkswagen Golf 1.5 TSI Match 5dr

Volkswagen Golf 1.5 TSI Match 5dr

View
£23,999

Sold vehicle details

£27,765

VolkswagenGolf 1.5 TSI eHybrid 19.7kWh Style Plug-in DSG (204 ps) - PADDLE SHIF

158 Volkswagen Golf reviews

Contact the dealer

Carsa Bradford

01274 914 506*
View all stock at this dealer
* Calls may be recorded for training and monitoring purposes. Please refrain from providing credit/debit card information on these calls. If you do so it is at your own risk.
This dealer has committed to AA Cars Standards | tsi APPROVED CODE™ tradingstandards.uk

Overview

  • Mileage:
    4,231
  • Year:
    2025
  • Fuel type: N/a
  • Transmission: Automatic
  • Body type: Hatchback
  • Colour: White
  • Doors: 5
  • Engine size: 1.5 L
  • CO2 Emissions: 6 g/km

Please note: Dealers are responsible for the content of their listings and are expected to include all fees in the advertised price. You should always confirm all listing details with the dealer before purchasing.

Vehicle details

Discover the Volkswagen Golf a stylish, plug-in hybrid hatchback designed for modern driving. Enjoy seamless journeys with Adaptive Cruise Control, a reversing camera, front and rear parking sensors, and convenient keyless start. Stay on track with built-in sat nav and enjoy the comfort of dual-zone climate control. The sporty 17in alloy wheels add to its sophisticated look, while paddle shift options put you in command. Comes with charging leads for easy top-ups wherever you go. MOT to 29/01/2028. Visit our website for service history, online valuation, full vehicle specification plus multiple images. This vehicle is VAT qualifying. Any feature/option specified here is from 3rd party data. We cannot guarantee the accuracy of any specification supplied by a 3rd party. We recommend that you physically check the specification of the vehicle on site prior to purchase. This information does not form part of the buying contract. Terms & Conditions apply. We have over 2,000 cars available from our 10 national branches, check our website to see all our stock. Our Trustpilot rating is 4.4/5 with over 8,000 reviews.

Vehicle features

  • Adaptive Cruise Control
  • Reversing Camera
  • Sat Nav
  • Front and Rear Parking Sensors
  • Paddle Shift
  • 17 inch alloys
  • Charging Leads
  • Keyless Start
  • Climate Control
  • DAB
  • Auto Headlights
  • USB Audio
  • Ambient interior lighting
  • Daytime Running Lights
  • Electronic hand brake
  • ISOFIX
  • Speed Limiter
  • 12V Socket - Centre Console
  • 12V Socket - Luggage Compartment
  • 17in Alloy Wheels - Nottingham
  • 2 USB-C Ports in the Front - 2 USB-C Ports in Centre Console in the Rear - Charging Capacity up to 45 W
  • 3-Point Seat Belts for the Outer Rear Seats
  • 3-Point Seatbelts in Front with Height Adjustment and Seatbelt Pretensioners
  • 6 Speakers - 4 Front-2 Rear with Centre Speaker
  • Activated Carbon Canister - Evaporative Emission Control System - EVAP
  • Adaptive Cruise Control
  • Advanced Driver Attention and Drowsiness Monitor
  • Air Care Climatronic 3-Zone with Rear Air Conditioning Control Panel
  • Alarm with Interior Protection
  • Ambient Lighting with 30 Colour Options
  • Auto-dimming Rear View Mirror
  • Automatic Headlight Control with LED Separate Daytime Running Lights and Coming Home-Leaving Home Feature
  • Autonomous Emergency Braking - Front Assist with Pedestrian and Cycling Monitoring
  • Body Coloured Bumpers - Air Intake with Chrome Trim
  • Body Coloured Door Handles
  • Body-Coloured Door Mirrors with Integrated Indicators
  • Carpet Mats - Front and Rear
  • Charging Cable Mode 2 - Type 2 G - 10 Amp
  • Charging Cable Mode 3 - Type 2 3 32A
  • Chrome Trims on the Side Window Bottoms
  • Curtain and Side Airbags in Front with Centre Airbag
  • DAB - Digital Radio Reception
  • Decorative Inserts - New Brushed Dark Metal - for Dashboard and Front Door Trim Panels
  • Digital Cockpit Pro
  • Disc Brakes in Front
  • Disc Brakes in Rear
  • Diversity Antenna for FM Reception
  • Door Insert - Side Trim Panel and Arm Support in Leatherette
  • Door Mirrors - Convex on Passenger Side - Aspherical on Driver Side
  • Door and Side Trim Panel
  • Driver and Front Passenger Airbag with Front Passenger Airbag Deactivation
  • Drivers Assistance Pack
  • Driving Profile Selection
  • Dynamic Headlight Range Control
  • Dynamic Road Sign Display
  • E-Sim Card for Online Connectivity
  • ESC - Electronic Stability Control
  • Electronic Parking Brake with Auto Hold Function
  • Extended Pedestrian Protection Measures
  • Extended Safety System - Proactive Passenger Protection System
  • Exterior Ambient Lighting with Illuminated Molding Between the Headlamps and Door Handle Recess
  • Front Centre Armrest
  • Front Head Restraints
  • Front Seats with Manual Height Adjustment
  • Front Stabilizer Bar
  • Heat Insulating Glass in Side and Rear Windows
  • Hill Start Assist
  • ISOFIX Anchors for Child Seats on Outer Rear Seats and Front Passenger Seat - Compatible with i-Size
  • Inserts of Front Seats and Outer Rear Seats in ArtVelours Microfleece
  • Keyless Start with SAFELOCK
  • LED Light Unit in Front Footwell - Selectable Light Colour
  • LED Performance Headlights
  • LED Rear Combination Lamps
  • Laminated Safety Glass Windshield - Heat Insulating
  • Lane Change System with Side Assist - Rear Traffic Alert and Exit Warning System
  • Lane Keeping System Lane Assist
  • Lights and Vision Package
  • Manually Adjustable Lumbar Support in Front Seats
  • Mobile Phone Interface with Wireless Inductive Charging Function
  • Multifunction Front Facing Camera for Distance Control
  • Navigation System
  • Oncoming Vehicle Braking when Turning including Swerve Support
  • Parking Sensors - Front and Rear
  • Plastic Gearshift Knob-Handle
  • Poor Weather Light and Cornering light
  • Power Assisted Steering - Speed Sensitive
  • Preparation for Light Assist System for Features on Demand
  • Preparation for We Connect and We Connect Plus
  • Reading Lights - Front and Rear x2 Incorporating LED Technology
  • Rear Exhaust Tailpipe
  • Rear Fog Light on One Side and Reversing Lights on Both Sides
  • Rear Seat Bench Unsplit - Backrest Split Folding with Centre Armrest - Cupholder and Loadthrough
  • Rear View Camera
  • Remote Electrically Foldable Door Mirrors - Puddle Lights and Reverse Activated Passengers Door Mirror
  • Speed Limiter
  • Speedo - Rev Counter - Electronic Odometer - Trip - Service Interval Display and Exterior Temperature Display
  • Sports Comfort Seats in Front
  • Standard Pedal Cluster
  • Start-Stop Function with Battery Regeneration - Recuperation - Energy Recovery During Braking
  • Steering Wheel - Multifunction - Leather Wrapped - Shift Paddles
  • Sun Visors with Illuminated Vanity Mirrors
  • Three Rear Head Restraints
  • Two-Tone Horn
  • Tyre Mobility Kit and Compressor
  • Tyre Pressure Loss Indicator
  • Voice Control and Voice Enhancer
  • Warning Signal and Warning Light for Front and Rear Seat Belts Not Fastened
  • Welcome Light with Surround Lighting
  • Wireless App Connect
  • XDS Electronic Differential Lock for Improved Traction and Handling
  • eCall - Emergency Call Service
Remember to check the details of this car with the dealer before you buy it to make sure that all the information is accurate.

Vehicle history check

For YJ74JRN

  • Icon - tick in circle Not recorded as stolen
  • Icon - tick in circle No third-party trace
  • Icon - tick in circle 0 previous keepers show

    The current keeper is not included in the number of previous keepers.

    This vehicle has had 1 registered keeper from new. Please note that the keeper is not necessarily the owner, it may be a company vehicle or belong to a third party.

  • Icon - tick in circle No plate changes
  • Icon - tick in circle No colour changes
  • Icon - tick in circle Mileage data not available
  • Icon - tick in circle Not an insurance write-off
Data for this history check supplied: 16/08/2025 at 09:16

What's not included?

  • Icon - cross in circle Outstanding finance details
  • Icon - cross in circle Estimated cost of vehicle ownership
  • Icon - cross in circle MOT history & common failures*
  • Icon - cross in circle Full vehicle specification
  • Icon - cross in circle Mileage discrepancies*
  • Icon - cross in circle Market valuation*
  • Icon - cross in circle Vehicle Tax Check
*Provided where available

Get peace of mind with an instant full vehicle history check and uncover any potential issues before you buy.

Get this vehicle checked

Buy with the AA

This dealer has signed up to our AA Cars Standards.

Icon - 5 stars

AA Cars Standards

Find out more about

AA Cars Standards
Icon - vehicle with spanner

Get exclusive AA offers

12 months free breakdown cover (or discounted upgrade if you're an AA member) and £75 off a Service & MOT. T&Cs apply

Activate offers

12 months free breakdown cover

  • Included with this vehicle
  • Free Accident Assist service available 24/7
  • Already with the AA? Upgrade your cover for only £10 for the year^

Unlock your offers up to six months after buying one of our vehicles.

Activate cover ^T&C's apply

Get 10% off Car Insurance

Take out a quote today and we will automatically apply 10% discount.

Get a quote today T&C's apply

Need to sell your car?

  • 5,000+ dealers compete
  • 100% free

Sell your car for a great price with our trusted partner Motorway.

Get an instant valuation

Category write-offs

A vehicle that has been in an accident will be assessed by insurance companies and assigned a category: A, B, S or N. However, we only list Cat S or N cars as Cat A and B cars are not roadworthy and safe.

Category S (formerly Category C)

The 'S' in Cat S stands for structural damage. This means the vehicle has damage to its structure/chassis, which is more than just cosmetic damage. But the vehicle can be professionally repaired, making it safe and roadworthy.

Category N (formerly Category D)

Similarly, the 'N' in Cat N stands for non-structural damage. Here, the vehicle has sustained damage, but it has not affected the structure/chassis. A Cat N car is safe to drive as the damage could be minimal/cosmetic.

Buying a written-off vehicle:

  • Do a full vehicle history check to identify category vehicles.
  • Make sure to check with the dealer if a Cat S/N vehicle has been professionally repaired.
  • Book a vehicle inspection and our experts will look over a Category vehicle for you.

Connect with us

Facebook X YouTube LinkedIn
For customers
  • Customer terms & conditions
  • Our dealers
  • Motoring advice
  • Car delivery
  • Why AA Cars
  • Customer data request form
For dealers
  • Car dealer terms & conditions
  • AA Cars Standards code (trade)
  • Advertise with us
Other
  • Contact us
  • About us
  • Privacy notice
  • Cookie policy
  • Sitemap
Vehicle Inspections

The AA recommends an AA Cars Vehicle Inspection before purchase. Not all cars are mechanically checked by the AA.

  • Vehicle Inspection
  • theAA.com
© AA Cars 2025  | Company No. 4546950  |  VAT No. 188 0311 10