Find a dealer
The AA
The AA
  • Used Cars
    Back Used Cars
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Audi
      • BMW
      • Citroen
      • Ford
      • Hyundai
      • Jaguar
      • Kia
      • Land Rover
      • Mercedes
      • MINI
      • Nissan
      • Peugeot
      • Porsche
      • Renault
      • Skoda
      • Toyota
      • Vauxhall
      • Volkswagen
      • Volvo
      • Browse by manufacturer
      • Search all used cars
    • Browse by Model
      Back Browse by Model
      • Audi A1
      • Audi A3
      • Audi Q5
      • BMW 3 Series
      • Fiat 500
      • Ford Fiesta
      • Ford Focus
      • Ford Kuga
      • Kia Sportage
      • Mercedes A Class
      • Mercedes C Class
      • MINI Hatch
      • Nissan Juke
      • Nissan Qashqai
      • Peugeot 208
      • Range Rover Evoque
      • Toyota Yaris
      • Vauxhall Astra
      • Vauxhall Corsa
      • Vauxhall Mokka
      • Volkswagen Golf
      • Volkswagen Polo
      • Volkswagen Tiguan
      • Search all used cars
    • Browse by Location
      Back Browse by Location
      • Birmingham
      • Bristol
      • Cardiff
      • Doncaster
      • Edinburgh
      • Glasgow
      • Hull
      • Leeds
      • Leicester
      • Liverpool
      • London
      • Manchester
      • Newcastle
      • Norwich
      • Nottingham
      • Portsmouth
      • Reading
      • Sheffield
      • Southampton
      • Swindon
      • All locations
    • Browse by Body style
      Back Browse by Body style
      • SUVs
      • 7 Seaters
      • Sports cars
      • 4x4
      • Estates
      • Hatchbacks
      • Motorhomes
      • Family cars
      • Convertibles
      • Coupes
      • Saloons
      • Luxury cars
      • People carriers
      • City cars
      • Superminis
      • Supercars
      • Executive cars
      • All bodystyles
    • Browse by Fuel type
      Back Browse by Fuel type
      • Used diesel cars
      • Used electric cars
      • Used hybrid cars
      • Used petrol cars
    • Browse by Transmission
      Back Browse by Transmission
      • Used automatic cars
      • Used manual cars
    • Browse by Maximum price
      Back Browse by Maximum price
      • Used cars under £30,000
      • Used cars under £20,000
      • Used cars under £15,000
      • Used cars under £10,000
      • Used cars under £5,000
      • Used cars under £4,000
      • Used cars under £3,000
      • Used cars under £2,000
      • Used cars under £1,000
    • Buying advice
      Back Buying advice
      • Best used 4x4 cars
      • Best used 7-seater cars
      • Best used electric cars
      • Best used estate cars
      • Best used family cars
      • Best used first cars
      • Best used fuel efficient cars
      • Best used hybrid cars
      • Best used second-hand cars
      • Best used small cars
      • Best used sports cars
      • Best used SUV cars
    • Car checks and delivery
      Back Car checks and delivery
      • Used vehicle inspection
      • Car history check
      • Vehicle delivery
  • Used Vans
    Back Used Vans
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Citroen
      • Fiat
      • Ford
      • Isuzu
      • Iveco
      • Mercedes
      • Mitsubishi
      • Nissan
      • Peugeot
      • Renault
      • Toyota
      • Vauxhall
      • Volkswagen
      • Search all used vans
    • Browse by Model
      Back Browse by Model
      • Citroen Dispatch
      • Citroen Relay
      • Ford Ranger
      • Ford Transit
      • Ford Transit Connect
      • Mercedes Sprinter
      • Mercedes Vito
      • Mitsubishi l200
      • Nissan Navara
      • Peugeot Boxer
      • Peugeot Expert
      • Peugeot Partner
      • Renault Kangoo
      • Renault Trafic
      • Toyota Hi Lux
      • Vauxhall Combo
      • Vauxhall Movano
      • Vauxhall Vivaro
      • Volkswagen Caddy
      • Volkswagen Crafter
      • Volkswagen Transporter
      • Search all used vans
    • Van checks and delivery
      Back Van checks and delivery
      • Used vehicle inspection
      • Van history check
      • Vehicle delivery
  • Finance
    Back Finance
    • Car finance
    • Car finance calculator
    • Eligibility checker
    • Car finance explained
    • PCP car finance
    • HP car finance
    • Car loans
  • Leasing
    Back Leasing
    • Car leasing
      Back Car leasing
      • All car leasing
        • Search by make
        • Fiat
        • Hyundai
        • Nissan
        • Skoda
        • Vauxhall
        • Volkswagen
        • Search by type
        • Electric
        • Hybrid
        • Automatic
        • SUV
        • Hatchback
        • Estate
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Van leasing
      Back Van leasing
      • All van leasing
        • Search by make
        • Ford
        • Mercedes
        • Nissan
        • Peugeot
        • Renault
        • Volkswagen
        • Search by type
        • Luton vans
        • Crew vans
        • Pick-up vans
        • Tipper vans
        • Dropside vans
        • High-roof vans
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Business leasing
      Back Business leasing
      • All business leasing
    • Help and guides
      Back Help and guides
        • Leasing guides
        • How AA Lease works
        • What is a car lease
        • Pros and cons of leasing
        • Common lease misbeliefs
        • Returning your lease vehicle
        • View all leasing guides
        • Help
        • FAQs
        • Contact us
  • Sell
    Back Sell
    • Sell my car
    • Sell my van
    • Value my car
  • Aftercare
    Back Aftercare
    • Car warranty
    • Breakdown cover
    • Car insurance
    • Car servicing
    • MOT
    • Car smart care
  • Advice
    Back Advice
    • Buying a used car online
    • Car reviews
    • Buyers guides
    • Best cars
    • Driving advice
  • Your account
  • Find a dealer
This car is no longer available

Other recommendations

Toyota C-HR DESIGN

Toyota C-HR DESIGN

View
£13,400
Toyota C-HR DESIGN

Toyota C-HR DESIGN

View
£15,600
Toyota C-HR EXCEL

Toyota C-HR EXCEL

View
£16,600
Toyota C-HR ICON

Toyota C-HR ICON

View
£17,200

Sold vehicle details

£17,309

ToyotaC-HR 1.8 Hybrid Icon 5dr CVT Hybrid Hatchback

1 Toyota C-HR review

Contact the dealer

Vertu Toyota Ayr

01292 814 926*
View all stock at this dealer
* Calls may be recorded for training and monitoring purposes. Please refrain from providing credit/debit card information on these calls. If you do so it is at your own risk.
This dealer has committed to AA Cars Standards | tsi APPROVED CODE™ tradingstandards.uk

Overview

  • Mileage:
    27,982
  • Year:
    2022
  • Fuel type: Hybrid
  • Transmission: Automatic
  • Body type: Hatchback
  • Colour: Decuma grey (metallic paint)
  • Doors: 5
  • Engine size: 1.8 L
  • CO2 Emissions: 110 g/km

Please note: Dealers are responsible for the content of their listings and are expected to include all fees in the advertised price. You should always confirm all listing details with the dealer before purchasing.

Vehicle details

Toyota C-HR 1.8 Hybrid Icon 5dr CVT Hybrid Hatchback - Includes 500 saving, Includes 500 saving, Im pleased to offer this well-maintained C-HR Icon 1.8 Hybrid, finished in stylish Decuma Grey metallic. First registered in March 2022 and with just 27,979 miles, its a low-mileage, fuel-efficient choice. It features climate control, rear camera, pre-crash safety, parking sensors, rain-sensing wipers, and automatic lights. Plus, Apple CarPlay and Android Auto keep you connected on the go. A reliable and comfortable hybrid SUV with great spec all round.

Vehicle features

  • Front and rear power windows
  • Rear window wiper
  • Auto up and down function on all power windows
  • Anti-jam protection on power windows
  • Rear window defogger
  • UV-filter on driver and passenger windows
  • Noise reduction layer on front windows and windscreen
  • UV-filter on rear windows
  • Variable front intermittent wipers
  • ABS+EBD+Brake assist
  • Electronic parking brake
  • Hill start assist control (HAC)
  • 16 Disk front wheel brake
  • Vehicle Stability Control (VSC)
  • Bluetooth connectivity
  • Voice recognition
  • E-call
  • Apple car play and Android auto
  • Electric power steering
  • Adaptive cruise control
  • Reversing camera
  • Pre collision system with pedestrian detection
  • Lane departure alert with Steering Control
  • Multimedia switches on steering wheel
  • Adjustable speed limiter switch on steering wheel
  • Voice recognition switch on steering wheel
  • Lane trace assist
  • Remote boot door release in cabin
  • Remote boot door release in key
  • Push button tailgate release
Remember to check the details of this car with the dealer before you buy it to make sure that all the information is accurate.

Vehicle history check

For SK22EVM

  • Icon - tick in circle Not recorded as stolen
  • Icon - tick in circle No third-party trace
  • Icon - tick in circle 0 previous keepers show

    The current keeper is not included in the number of previous keepers.

    This vehicle has had 1 registered keeper from new. Please note that the keeper is not necessarily the owner, it may be a company vehicle or belong to a third party.

  • Icon - tick in circle No plate changes
  • Icon - tick in circle No colour changes
  • Icon - tick in circle Mileage data available † show

    Source Date Mileage
    MOT 19/03/2025 27,622
    RMI MIL'GE 23/07/2024 21,881
    RMI MIL'GE 16/01/2024 16,630
  • Icon - tick in circle Not an insurance write-off
Data for this history check supplied: 21/06/2025 at 02:20

What's not included?

  • Icon - cross in circle Outstanding finance details
  • Icon - cross in circle Estimated cost of vehicle ownership
  • Icon - cross in circle MOT history & common failures*
  • Icon - cross in circle Full vehicle specification
  • Icon - cross in circle Mileage discrepancies*
  • Icon - cross in circle Market valuation*
  • Icon - cross in circle Vehicle Tax Check
*Provided where available

Get peace of mind with an instant full vehicle history check and uncover any potential issues before you buy.

Get this vehicle checked

Buy with the AA

This dealer has signed up to our AA Cars Standards.

Icon - 5 stars

AA Cars Standards

Find out more about

AA Cars Standards
Icon - vehicle with spanner

Get exclusive AA offers

12 months free breakdown cover (or discounted upgrade if you're an AA member) and £75 off a Service & MOT. T&Cs apply

Activate offers

12 months free breakdown cover

  • Included with this vehicle
  • Free Accident Assist service available 24/7
  • Already with the AA? Upgrade your cover for only £10 for the year^

Unlock your offers up to six months after buying one of our vehicles.

Activate cover ^T&C's apply

Get 10% off Car Insurance

Take out a quote today and we will automatically apply 10% discount.

Get a quote today T&C's apply
VERTU MOTORS

Sell My Car

Sell your car in 3 simple steps!

Value it, book it, sell it.

Sell My Car

Category write-offs

A vehicle that has been in an accident will be assessed by insurance companies and assigned a category: A, B, S or N. However, we only list Cat S or N cars as Cat A and B cars are not roadworthy and safe.

Category S (formerly Category C)

The 'S' in Cat S stands for structural damage. This means the vehicle has damage to its structure/chassis, which is more than just cosmetic damage. But the vehicle can be professionally repaired, making it safe and roadworthy.

Category N (formerly Category D)

Similarly, the 'N' in Cat N stands for non-structural damage. Here, the vehicle has sustained damage, but it has not affected the structure/chassis. A Cat N car is safe to drive as the damage could be minimal/cosmetic.

Buying a written-off vehicle:

  • Do a full vehicle history check to identify category vehicles.
  • Make sure to check with the dealer if a Cat S/N vehicle has been professionally repaired.
  • Book a vehicle inspection and our experts will look over a Category vehicle for you.

Connect with us

Facebook X YouTube LinkedIn
For customers
  • Customer terms & conditions
  • Our dealers
  • Motoring advice
  • Electric cars
  • Car delivery
  • Why AA Cars
  • Customer data request form
For dealers
  • Car dealer terms & conditions
  • AA Cars Standards code (trade)
  • Advertise with us
Other
  • Contact us
  • About us
  • Privacy notice
  • Cookie policy
  • Sitemap
Vehicle Inspections

The AA recommends an AA Cars Vehicle Inspection before purchase. Not all cars are mechanically checked by the AA.

  • Vehicle Inspection
  • theAA.com
© AA Cars 2025  | Company No. 4546950  |  VAT No. 188 0311 10