Find a dealer
The AA
The AA
  • Used Cars
    Back Used Cars
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Audi
      • BMW
      • Citroen
      • Ford
      • Hyundai
      • Jaguar
      • Kia
      • Land Rover
      • Mercedes
      • MINI
      • Nissan
      • Peugeot
      • Porsche
      • Renault
      • Skoda
      • Toyota
      • Vauxhall
      • Volkswagen
      • Volvo
      • Browse by manufacturer
      • Search all used cars
    • Browse by Model
      Back Browse by Model
      • Audi A1
      • Audi A3
      • Audi Q5
      • BMW 3 Series
      • Fiat 500
      • Ford Fiesta
      • Ford Focus
      • Ford Kuga
      • Kia Sportage
      • Mercedes A Class
      • Mercedes C Class
      • MINI Hatch
      • Nissan Juke
      • Nissan Qashqai
      • Peugeot 208
      • Range Rover Evoque
      • Toyota Yaris
      • Vauxhall Astra
      • Vauxhall Corsa
      • Vauxhall Mokka
      • Volkswagen Golf
      • Volkswagen Polo
      • Volkswagen Tiguan
      • Search all used cars
    • Browse by Location
      Back Browse by Location
      • Birmingham
      • Bristol
      • Cardiff
      • Doncaster
      • Edinburgh
      • Glasgow
      • Hull
      • Leeds
      • Leicester
      • Liverpool
      • London
      • Manchester
      • Newcastle
      • Norwich
      • Nottingham
      • Portsmouth
      • Reading
      • Sheffield
      • Southampton
      • Swindon
      • All locations
    • Browse by Body style
      Back Browse by Body style
      • SUVs
      • 7 Seaters
      • Sports cars
      • 4x4
      • Estates
      • Hatchbacks
      • Motorhomes
      • Family cars
      • Convertibles
      • Coupes
      • Saloons
      • Luxury cars
      • People carriers
      • City cars
      • Superminis
      • Supercars
      • Executive cars
      • All bodystyles
    • Browse by Fuel type
      Back Browse by Fuel type
      • Used diesel cars
      • Used electric cars
      • Used hybrid cars
      • Used petrol cars
    • Browse by Transmission
      Back Browse by Transmission
      • Used automatic cars
      • Used manual cars
    • Browse by Maximum price
      Back Browse by Maximum price
      • Used cars under £30,000
      • Used cars under £20,000
      • Used cars under £15,000
      • Used cars under £10,000
      • Used cars under £5,000
      • Used cars under £4,000
      • Used cars under £3,000
      • Used cars under £2,000
      • Used cars under £1,000
    • Buying advice
      Back Buying advice
      • Best used 4x4 cars
      • Best used 7-seater cars
      • Best used electric cars
      • Best used estate cars
      • Best used family cars
      • Best used first cars
      • Best used fuel efficient cars
      • Best used hybrid cars
      • Best used second-hand cars
      • Best used small cars
      • Best used sports cars
      • Best used SUV cars
    • Car checks and delivery
      Back Car checks and delivery
      • Used vehicle inspection
      • Car history check
      • Vehicle delivery
  • Used Vans
    Back Used Vans
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Citroen
      • Fiat
      • Ford
      • Isuzu
      • Iveco
      • Mercedes
      • Mitsubishi
      • Nissan
      • Peugeot
      • Renault
      • Toyota
      • Vauxhall
      • Volkswagen
      • Search all used vans
    • Browse by Model
      Back Browse by Model
      • Citroen Dispatch
      • Citroen Relay
      • Ford Ranger
      • Ford Transit
      • Ford Transit Connect
      • Mercedes Sprinter
      • Mercedes Vito
      • Mitsubishi l200
      • Nissan Navara
      • Peugeot Boxer
      • Peugeot Expert
      • Peugeot Partner
      • Renault Kangoo
      • Renault Trafic
      • Toyota Hi Lux
      • Vauxhall Combo
      • Vauxhall Movano
      • Vauxhall Vivaro
      • Volkswagen Caddy
      • Volkswagen Crafter
      • Volkswagen Transporter
      • Search all used vans
    • Van checks and delivery
      Back Van checks and delivery
      • Used vehicle inspection
      • Van history check
      • Vehicle delivery
  • Finance
    Back Finance
    • Car finance
    • Car finance calculator
    • Eligibility checker
    • Car finance explained
    • PCP car finance
    • HP car finance
    • Car loans
  • Leasing
    Back Leasing
    • Car leasing
      Back Car leasing
      • All car leasing
        • Search by make
        • Fiat
        • Hyundai
        • Nissan
        • Skoda
        • Vauxhall
        • Volkswagen
        • Search by type
        • Electric
        • Hybrid
        • Automatic
        • SUV
        • Hatchback
        • Estate
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Van leasing
      Back Van leasing
      • All van leasing
        • Search by make
        • Ford
        • Mercedes
        • Nissan
        • Peugeot
        • Renault
        • Volkswagen
        • Search by type
        • Luton vans
        • Crew vans
        • Pick-up vans
        • Tipper vans
        • Dropside vans
        • High-roof vans
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Business leasing
      Back Business leasing
      • All business leasing
    • Help and guides
      Back Help and guides
        • Leasing guides
        • How AA Lease works
        • What is a car lease
        • Pros and cons of leasing
        • Common lease misbeliefs
        • Returning your lease vehicle
        • View all leasing guides
        • Help
        • FAQs
        • Contact us
  • Sell
    Back Sell
    • Sell my car
    • Sell my van
    • Value my car
  • Aftercare
    Back Aftercare
    • Car warranty
    • Breakdown cover
    • Car insurance
    • Car servicing
    • MOT
    • Car smart care
  • Advice
    Back Advice
    • Buying a used car online
    • Car reviews
    • Buyers guides
    • Best cars
    • Driving advice
  • Your account
  • Find a dealer
This car is no longer available

Other recommendations

Mercedes A Class 1.5 A180d SE Hatchback 5dr Diesel 7G-DCT Euro 6 (s/s) (116 ps)

Mercedes-Benz A Class 1.5 A180d SE Hatchback 5dr Diesel 7G-DCT Euro 6 (s/s) (116 ps)

View
£14,450
Mercedes A Class AUTOMATIC 1.7 A170 Avantgarde SE Hatchback 5dr Petrol CVT (166 g

MERCEDES-BENZ A-CLASS AUTOMATIC 1.7 A170 Avantgarde SE Hatchback 5dr Petrol CVT (166 g

View
£4,495
Mercedes A Class AUTOMATIC 1.6 A180 Sport Hatchback 5dr Petrol 7G-DCT Euro 6 (s/s

MERCEDES-BENZ A-CLASS AUTOMATIC 1.6 A180 Sport Hatchback 5dr Petrol 7G-DCT Euro 6 (s/s

View
£9,995
Mercedes A Class A 180 D AMG LINE

Mercedes-Benz A Class A 180 D AMG LINE

View
£15,400

Sold vehicle details

£22,946

Mercedes-BenzA Class 1.3 A250e 15.6kWh AMG Line Edition (Premium Plus) Plug-in 8G-DCT

47 Mercedes-Benz A Class reviews

Contact the dealer

Carsa Cannock

0121 540 2607*
View all stock at this dealer
* Calls may be recorded for training and monitoring purposes. Please refrain from providing credit/debit card information on these calls. If you do so it is at your own risk.
This dealer has committed to AA Cars Standards | tsi APPROVED CODE™ tradingstandards.uk

Overview

  • Mileage:
    12,241
  • Year:
    2021
  • Fuel type: N/a
  • Transmission: Automatic
  • Body type: Hatchback
  • Colour: Blue
  • Doors: 5
  • Engine size: 1.3 L
  • CO2 Emissions: 25 g/km

Please note: Dealers are responsible for the content of their listings and are expected to include all fees in the advertised price. You should always confirm all listing details with the dealer before purchasing.

Vehicle details

Experience the best of technology and comfort with this striking blue Mercedes-Benz A Class Hatchback. Enjoy open skies with the panoramic sunroof and personalised comfort thanks to heated, electric front seats with memory settings. Stay connected on the go with integrated Apple CarPlay and WiFi, while Multibeam LED headlights illuminate every journey. Manoeuvre with ease using Park Assist and a reversing camera, and drive confidently with features like Active Lane Assist and Lane Departure Warning. A sophisticated choice for modern drivers. 2 services recorded, last serviced on 09/06/2025 at 12,241 miles. MOT to 29/07/2025. Visit our website for service history, online valuation, full vehicle specification plus multiple images. We have over 1,800 cars available from our 10 national branches, check our website to see all our stock. Our Trustpilot rating is 4.4/5 with over 8,000 reviews.

Vehicle features

  • Sunroof
  • Apple CarPlay
  • Active Lane Assist
  • Multibeam LED Headlights
  • LED Headlights
  • Reversing Camera
  • Heated Seats
  • Sat Nav
  • Front Memory Seats
  • Wifi
  • Bluetooth Phone + Audio Streaming
  • Keyless-Go
  • Driving Modes
  • Paddle Shift
  • Dual Zone Digital Climate Control
  • Half Leather
  • Traffic Sign Recognition
  • LED Daytime Running Lights
  • 18 inch alloys
  • Air Conditioning
  • Charging Leads
  • Keyless Start
  • DAB
  • Rear Privacy Glass
  • Sports Seats
  • USB Audio
  • Ambient interior lighting
  • Parking Sensors
  • Auto Headlights
  • Electric Folding Mirrors
  • Cruise Control with Speed Limiter
  • Split Folding Rear Seats
  • Electric Adjustable Lumbar Support
  • Electronic hand brake
  • 2x Rear ISOFIX
  • Multi-Function Steering Wheel
  • Speed Limit Display
  • Android Auto
  • Electric Windows
  • Dual Clutch Transmission
  • Voice Control
  • 18in Alloy Wheels - AMG 5-Twin Spoke - Aerodynamically Optimised - Painted in Black with High-Sheen Finish
  • ABS - Anti-Lock Braking System with BAS - Brake Assist
  • AMG Bodystyling - AMG Front Apron with Front Splitter - AMG Side Sill Panels and AMG Rear Apron with Visible Exhaust Tailpipe Trim Elements
  • ATTENTION Assist
  • Acoustic Ambient Protection
  • Active Bonnet - Pedestrian Safety Measure which Detects an Impact and Raises Bonnet by 65mm
  • Active Brake ASSIST
  • Active Lane Keeping Assist
  • Adaptive Brake Assist with Hold Function and Hill Start Assist
  • Adaptive Brake Lights
  • Air Conditioning - THERMOTRONIC Luxury Automatic Climate Control - Two-Zone with Display
  • Air Vents - Black with Silver Chrome Elements
  • Airbag - Kneebag for Driver
  • Airbags - Dual Stage - Driver and Front Passenger
  • Airbags - Head and Sidebags - Driver and Front Passenger
  • Airbags - Windowbags for Driver and Front Passenger
  • Alarm System with Immobiliser and Interior Protection - Thatcham Category 1
  • Automatic Child Seat Recognition Sensor
  • Beltline Strips - High Gloss Black
  • Bodystyling - Side Skirts - Body-Coloured
  • Brake-Pad Wear Warning Indicator
  • Brushed Stainless Steel Sports Pedals with Rubber Studs
  • Bumpers - Body Coloured
  • Car Wash Mode
  • Centre Armrest - Front with Stowage
  • Charging Cable 3 Pin Plug
  • Charging Cable for Wallbox and Public Charging Stations - Mode 3 - 16 A - 4m
  • Charging Socket
  • Charging System - AC Charging System Rated at 7.4 kW
  • Childproof Locks - Manually Operated for Rear Doors and Electrically Operated for Rear Power Windows
  • Chrome Weather Strip
  • Comfort Suspension
  • Crash-Responsive Emergency Lighting
  • Cruise Control with Limiter
  • DAB Digital Radio Tuner
  • Diamond Exclusive Radiator Grille
  • Direct Steer Speed-Sensitive Steering
  • Door Handles - Body Coloured
  • Door Mirrors - Electrically Adjustable and Heated with Integrated LED Indicators
  • Door Sills - Illuminated Front Door Sills with Changeable Cover and Mercedes-Benz Lettering
  • Dual Bluetooth Interfaces
  • Dynamic Select with a Choice of Driving Modes - ECO-Comfort-Sport and Individual
  • ESP - Electronic Stability Programme with ASR - Acceleration Skid Control
  • ESP Curve Dynamic Assist
  • Edition Badge on the Front Wings
  • Electric Parking Brake
  • Electric Windows - 4
  • Exhaust - Two Visible Tailpipe Trim Elements
  • First Aid Kit and Warning Triangle
  • Floor Mats - Black Top Stitching - Embroidered Edition Logo and Piping in Light Grey
  • Glass - Rear Windscreen - Heated with Timer Control
  • Hard-Disk Navigation
  • Headlamp Assist - Automatic Headlamp Activation
  • Heated Front Seats
  • Hey Mercedes - Voice Activation
  • High Level Third Brake Light - LED
  • ISOFIX and Top-Tether Child Seat Fixing Points in Rear - Two Outer Seats
  • Instrument Cluster - Fluid Level Warning Indicator for Fuel - Oil - Coolant and Washer Fluid
  • Instrument Cluster - Outside Temperature Display
  • Instrument Cluster - Service Indicator ASSYST
  • Instrument Cluster - Trip Computer in Multi-Function Display with Current Fuel Consumption Indicator
  • Instrument Display - 10.25in Display
  • Interior 64-Colour Ambient Lighting
  • Interior Mirror with Reading Lamps in Black and Frameless
  • KEYLESS-GO - Keyless Locking-Unlocking
  • KEYLESS-GO Starting Function
  • LED Tail Lamps
  • Light Failure Indicator
  • Light and Sight Package
  • Live Traffic Information
  • Luggage Nets on Driver and Front Passengers Backrests
  • MBUX Multimedia System
  • MULTIBEAM LED Headlights with Adaptive Highbeam Assist Plus
  • Media Display - 10.25-inch with Touchscreen
  • Mercedes Me - Remote Services
  • Mercedes Me Connect - Standard Services
  • Mercedes-Benz Sound System - 100W
  • Mirror Package
  • Night Package
  • Owners Manual - English
  • Panoramic Glass Sunroof
  • Parking Package
  • Pre-Entry Climate Control
  • Pre-Installation for Mercedes-Benz Link
  • Pre-Installation for Private Car Share
  • Privacy Glass
  • Radar-Based Recuperation
  • Radio Aerial Roof Spoiler
  • Rain-Sensing Windscreen Wipers with Two Sensitivity Settings
  • Rear Armrest with Two Cup Holders
  • Rear Axle - Multi-Link
  • Rear Fog Light
  • Rear Windscreen Wiper
  • Remote Central Locking and Crash Sensor with Emergency Opening Function
  • Remote and Charging Services Plus
  • Roof Lining - Black
  • Seat Belts - Black
  • Seat Belts - Rear Three-Point - 3
  • Seat Belts Reminder - Front and Rear
  • Seat Comfort Package
  • Seat Occupancy Sensor - Front Passenger Seat
  • Seats - Electrically Adjustable Front Memory Seats with Lumbar Support
  • Seats - Rear Seat Backrests - Split Folding 40-20-40
  • Smartphone Integration
  • Speed Limit Assist
  • Sports Seats with Integrated Head Restraints
  • Steering Column - Manually Adjustable for Height and Reach
  • Steering Wheel - 3-Spoke Multi-Function - Trimmed in Leather with Flattened Bottom Section and Perforated Leather in Grip Area with Galvanised Shift Paddles
  • Stowage Compartment in Centre Console with Retractable Cover
  • Summer Tyres
  • Sun Visors with Illuminated Vanity Mirrors
  • TIREFIT Tyre-Sealant Kit
  • Touchpad on Centre Console
  • Traffic Sign Assist
  • Trim - Matrix Look-Light Longitudinal-Grain Aluminium Trim Elements
  • Tyre Pressure Monitoring System
  • URBAN GUARD Vehicle Protection
  • USB - Type C - 2 Ports in Rear of Stowage Compartment and 1 in Front Centre Console
  • Window Line - Black
Remember to check the details of this car with the dealer before you buy it to make sure that all the information is accurate.

Vehicle history check

For KE21ZHZ

  • Not recorded as stolen
  • No third-party trace
  • 0 previous keepers show

    The current keeper is not included in the number of previous keepers.

    This vehicle has had 1 registered keeper from new. Please note that the keeper is not necessarily the owner, it may be a company vehicle or belong to a third party.

  • No plate changes
  • No colour changes
  • Mileage data available † show

    Source Date Mileage
    MOT 19/07/2024 9,630
    RMI MIL'GE 28/10/2022 3,944
  • Not an insurance write-off
Data for this history check supplied: 09/06/2025 at 09:16

What's not included?

  • Outstanding finance details
  • Estimated cost of vehicle ownership
  • MOT history & common failures*
  • Full vehicle specification
  • Mileage discrepancies*
  • Market valuation*
  • Vehicle Tax Check
*Provided where available

Get peace of mind with an instant full vehicle history check and uncover any potential issues before you buy.

Get this vehicle checked

Buy with the AA

This dealer has signed up to our AA Cars Standards.

  • Smart dressed figure icon

    AA Cars Standards

    Find out more about
    AA Cars Standards

AA

Free Breakdown Cover

12 months' free breakdown cover, or an upgrade if you're a member

Find out more

12 months' free breakdown cover

  • Included with this vehicle
  • Free Accident Assist service available 24/7
  • Already with the AA? Upgrade your cover for only £10 for the year^

Unlock your offers up to six months after buying one of our vehicles.

Activate cover ^T&C's apply

Get 10% off Car Insurance

Take out a quote today and we will automatically apply 10% discount.

Get a quote today T&C's apply

Need to sell your car?

  • 5,000+ dealers compete
  • 100% free

Sell your car for a great price with our trusted partner Motorway.

Get an instant valuation

Category write-offs

A vehicle that has been in an accident will be assessed by insurance companies and assigned a category: A, B, S or N. However, we only list Cat S or N cars as Cat A and B cars are not roadworthy and safe.

Category S (formerly Category C)

The 'S' in Cat S stands for structural damage. This means the vehicle has damage to its structure/chassis, which is more than just cosmetic damage. But the vehicle can be professionally repaired, making it safe and roadworthy.

Category N (formerly Category D)

Similarly, the 'N' in Cat N stands for non-structural damage. Here, the vehicle has sustained damage, but it has not affected the structure/chassis. A Cat N car is safe to drive as the damage could be minimal/cosmetic.

Buying a written-off vehicle:

  • Do a full vehicle history check to identify category vehicles.
  • Make sure to check with the dealer if a Cat S/N vehicle has been professionally repaired.
  • Book a vehicle inspection and our experts will look over a Category vehicle for you.

Connect with us

Facebook X YouTube LinkedIn
For customers
  • Customer terms & conditions
  • Our dealers
  • Motoring advice
  • Electric cars
  • New cars
  • Car delivery
  • Why AA Cars
  • Customer data request form
For dealers
  • Car dealer terms & conditions
  • AA Cars Standards code (trade)
  • Advertise with us
Other
  • Contact us
  • About us
  • Privacy notice
  • Cookie policy
  • Sitemap
Vehicle Inspections

The AA recommends an AA Cars Vehicle Inspection before purchase. Not all cars are mechanically checked by the AA.

  • Vehicle Inspection
  • theAA.com
© AA Cars 2025  | Company No. 4546950  |  VAT No. 188 0311 10