Find a dealer
The AA
The AA
  • Used Cars
    Back Used Cars
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Audi
      • BMW
      • Citroen
      • Ford
      • Hyundai
      • Jaguar
      • Kia
      • Land Rover
      • Mercedes
      • MINI
      • Nissan
      • Peugeot
      • Porsche
      • Renault
      • Skoda
      • Toyota
      • Vauxhall
      • Volkswagen
      • Volvo
      • Browse by manufacturer
      • Search all used cars
    • Browse by Model
      Back Browse by Model
      • Audi A1
      • Audi A3
      • Audi Q5
      • BMW 3 Series
      • Fiat 500
      • Ford Fiesta
      • Ford Focus
      • Ford Kuga
      • Kia Sportage
      • Mercedes A Class
      • Mercedes C Class
      • MINI Hatch
      • Nissan Juke
      • Nissan Qashqai
      • Peugeot 208
      • Range Rover Evoque
      • Toyota Yaris
      • Vauxhall Astra
      • Vauxhall Corsa
      • Vauxhall Mokka
      • Volkswagen Golf
      • Volkswagen Polo
      • Volkswagen Tiguan
      • Search all used cars
    • Browse by Location
      Back Browse by Location
      • Birmingham
      • Bristol
      • Cardiff
      • Doncaster
      • Edinburgh
      • Glasgow
      • Hull
      • Leeds
      • Leicester
      • Liverpool
      • London
      • Manchester
      • Newcastle
      • Norwich
      • Nottingham
      • Portsmouth
      • Reading
      • Sheffield
      • Southampton
      • Swindon
      • All locations
    • Browse by Body style
      Back Browse by Body style
      • SUVs
      • 7 Seaters
      • Sports cars
      • 4x4
      • Estates
      • Hatchbacks
      • Motorhomes
      • Family cars
      • Convertibles
      • Coupes
      • Saloons
      • Luxury cars
      • People carriers
      • City cars
      • Superminis
      • Supercars
      • Executive cars
      • All bodystyles
    • Browse by Fuel type
      Back Browse by Fuel type
      • Used diesel cars
      • Used electric cars
      • Used hybrid cars
      • Used petrol cars
    • Browse by Transmission
      Back Browse by Transmission
      • Used automatic cars
      • Used manual cars
    • Browse by Maximum price
      Back Browse by Maximum price
      • Used cars under £30,000
      • Used cars under £20,000
      • Used cars under £15,000
      • Used cars under £10,000
      • Used cars under £5,000
      • Used cars under £4,000
      • Used cars under £3,000
      • Used cars under £2,000
      • Used cars under £1,000
    • Buying advice
      Back Buying advice
      • Best used 4x4 cars
      • Best used 7-seater cars
      • Best used electric cars
      • Best used estate cars
      • Best used family cars
      • Best used first cars
      • Best used fuel efficient cars
      • Best used hybrid cars
      • Best used second-hand cars
      • Best used small cars
      • Best used sports cars
      • Best used SUV cars
    • Car checks and delivery
      Back Car checks and delivery
      • Used vehicle inspection
      • Car history check
      • Vehicle delivery
  • Used Vans
    Back Used Vans
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Citroen
      • Fiat
      • Ford
      • Isuzu
      • Iveco
      • Mercedes
      • Mitsubishi
      • Nissan
      • Peugeot
      • Renault
      • Toyota
      • Vauxhall
      • Volkswagen
      • Search all used vans
    • Browse by Model
      Back Browse by Model
      • Citroen Dispatch
      • Citroen Relay
      • Ford Ranger
      • Ford Transit
      • Ford Transit Connect
      • Mercedes Sprinter
      • Mercedes Vito
      • Mitsubishi l200
      • Nissan Navara
      • Peugeot Boxer
      • Peugeot Expert
      • Peugeot Partner
      • Renault Kangoo
      • Renault Trafic
      • Toyota Hi Lux
      • Vauxhall Combo
      • Vauxhall Movano
      • Vauxhall Vivaro
      • Volkswagen Caddy
      • Volkswagen Crafter
      • Volkswagen Transporter
      • Search all used vans
    • Van checks and delivery
      Back Van checks and delivery
      • Used vehicle inspection
      • Van history check
      • Vehicle delivery
  • Finance
    Back Finance
    • Car finance
    • Car finance calculator
    • Eligibility checker
    • Car finance explained
    • PCP car finance
    • HP car finance
    • Car loans
  • Leasing
    Back Leasing
    • Car leasing
      Back Car leasing
      • All car leasing
        • Search by make
        • Fiat
        • Hyundai
        • Nissan
        • Skoda
        • Vauxhall
        • Volkswagen
        • Search by type
        • Electric
        • Hybrid
        • Automatic
        • SUV
        • Hatchback
        • Estate
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Van leasing
      Back Van leasing
      • All van leasing
        • Search by make
        • Ford
        • Mercedes
        • Nissan
        • Peugeot
        • Renault
        • Volkswagen
        • Search by type
        • Luton vans
        • Crew vans
        • Pick-up vans
        • Tipper vans
        • Dropside vans
        • High-roof vans
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Business leasing
      Back Business leasing
      • All business leasing
    • Help and guides
      Back Help and guides
        • Leasing guides
        • How AA Lease works
        • What is a car lease
        • Pros and cons of leasing
        • Common lease misbeliefs
        • Returning your lease vehicle
        • View all leasing guides
        • Help
        • FAQs
        • Contact us
  • Sell
    Back Sell
    • Sell my car
    • Sell my van
    • Value my car
  • Aftercare
    Back Aftercare
    • Car warranty
    • Breakdown cover
    • Car insurance
    • Car servicing
    • MOT
    • Car smart care
  • Advice
    Back Advice
    • Buying a used car online
    • Car reviews
    • Buyers guides
    • Best cars
    • Driving advice
  • Your account
  • Find a dealer
This car is no longer available

Other recommendations

Mercedes EQB EQB 350 4MATIC AMG LINE

Mercedes-Benz EQB EQB 350 4MATIC AMG LINE

View
£25,800
Mercedes EQB EQB 300 AMG Line Premium 4Matic 4WD 5dr

MERCEDES-BENZ EQB EQB 300 AMG Line Premium 4Matic 4WD 5dr

View
£28,995
Mercedes EQB EQB 300 4MATIC AMG LINE

Mercedes-Benz EQB EQB 300 4MATIC AMG LINE

View
£26,000
Mercedes EQB EQB 300 4MATIC AMG LINE

Mercedes-Benz EQB EQB 300 4MATIC AMG LINE

View
£28,500

Sold vehicle details

£29,000

Mercedes-BenzEqb EQB 350 66.5kWh AMG Line (Premium) 4MATIC (292 ps) - REVERSE CAM

1 Mercedes-Benz Eqb review

Contact the dealer

Carsa Bolton

01204 219 667*
View all stock at this dealer
* Calls may be recorded for training and monitoring purposes. Please refrain from providing credit/debit card information on these calls. If you do so it is at your own risk.
This dealer has committed to AA Cars Standards | tsi APPROVED CODE™ tradingstandards.uk

Overview

  • Mileage:
    17,339
  • Year:
    2023
  • Fuel type: Electric
  • Transmission: Automatic
  • Body type: Suv
  • Colour: Black
  • Doors: 5

Please note: Dealers are responsible for the content of their listings and are expected to include all fees in the advertised price. You should always confirm all listing details with the dealer before purchasing.

Vehicle details

Experience the future of driving with this sleek black Mercedes-Benz EQB AMG Line. Enjoy the panoramic roof, sunroof, and spacious 7-seat layoutperfect for family adventures. Stay confident with Active Lane Assist, Blind Spot Assist, Lane Departure Warning, and a reversing camera. Luxury touches like heated seats, Keyless-Go, and LED headlights elevate every journey. Seamless connectivity comes courtesy of Apple CarPlay, Bluetooth audio streaming, WiFi, and an advanced sat nav system. Discover comfort and innovation in one remarkable electric SUV. 2 services recorded, last serviced on 26/04/2025 at 17,339 miles. MOT to 10/04/2026. Visit our website for service history, online valuation, full vehicle specification plus multiple images. We have over 1,800 cars available from our 10 national branches, check our website to see all our stock. Our Trustpilot rating is 4.4/5 with over 8,000 reviews.

Vehicle features

  • Panoramic Roof
  • Apple CarPlay
  • Active Lane Assist
  • LED Headlights
  • Reversing Camera
  • 7 Seats
  • Heated Seats
  • Sat Nav
  • Blind Spot Assist
  • Wifi
  • Bluetooth Phone + Audio Streaming
  • Keyless-Go
  • Driving Modes
  • Paddle Shift
  • Front and Rear Parking Sensors
  • Dual Zone Digital Climate Control
  • Wireless Charger
  • Half Leather
  • Digital Dash
  • LED Daytime Running Lights
  • 19 inch alloys
  • Electric Boot
  • Charging Leads
  • Keyless Start
  • DAB
  • Rear Privacy Glass
  • Ambient interior lighting
  • USB Audio
  • Auto Headlights
  • Electric Folding Mirrors
  • Cruise Control with Speed Limiter
  • Split Folding Rear Seats
  • Electric Adjustable Lumbar Support
  • Electronic hand brake
  • 2x Rear ISOFIX
  • Speed Limit Display
  • Electric Windows
  • Android Auto
  • Dual Clutch Transmission
  • Roof Rails
  • Voice Control
  • Four Wheel Drive
  • 100kW DC On-Board Charger
  • 11kW On-Board Charger
  • 19in Alloy Wheels - AMG 5-Twin Spoke Light - Aerodynamically Optimised - Painted in High-Gloss Black with High-Sheen Finish
  • ABS - Anti-Lock Braking System
  • AMG Line Bodystyling
  • Acoustic Ambient Protection
  • Active Brake Assist
  • Active Lane Keeping Assist
  • Active Speed Limit Assist
  • Adaptive Highbeam Assist
  • Airbag - Driver
  • Airbag - Passenger
  • Airbags - Kneebag
  • Ambient Lighting
  • Badge on the Wing in High-Gloss Black with Blue EQC Lettering
  • Black Open-Pore Linden Wood Trim
  • Black Panel Radiator Grille with Twin-Blade Design in Chrome
  • Blind Spot Assist
  • CCS-2 Connector - DC Charging with Combined Charging System - Compatible with AC and DC
  • Charging Cable - Type 2 - Mode 3
  • Charging Socket
  • Charging System - AC Charging System 11kW
  • Charging System - DC Charging System Rated at 100KW
  • Comfort Suspension
  • Cruise Control
  • Digital Radio
  • Door Sills - Illuminated with 'EQB' Lettering
  • Double Cupholder
  • Dynamic Select
  • EASY-PACK Electric Tailgate
  • EQ Navigation Services
  • Electric Windows - Front and Rear
  • Electrically Operated Panoramic Glass Sunroof
  • Floor Mats - Velour - AMG Lettering
  • GUARD 360 Degrees Vehicle Protection
  • Hard-Disc Navigation
  • Heat-Insulating - Dark Tinted Glass
  • Heated Front Seats
  • IONITY 1 Year
  • Interior Light Package
  • KEYLESS-GO Comfort Package
  • LED High Performance Headlights
  • Live Traffic Information - Free for the First Three Years
  • MBUX - Mercedes-Benz User Experience - Infotainment System
  • MBUX Augmented Reality for System Navigation
  • MBUX Multimedia System with Widescreen Cockpit - 2x 10in Displays with Touchpad
  • Mercedes Me Charge - 3 Years
  • Mercedes Me Connect
  • Mercedes-Benz Advanced Sound System - 225W
  • Mercedes-Benz Emergency Call System
  • Mirror Package
  • Parking Package with Reversing Camera
  • Pedals - Aluminium with Rubber Studs
  • Power Steering - Speed Sensitive
  • Pre-Entry Climate Control
  • Radar-Based Recuperation
  • Rear Armrest with Through-Loading Feature
  • Roof Lining - Black Fabric
  • Roof Rails - Polished Aluminium
  • Seat Comfort Package
  • Seats - Sports
  • Shift Paddles - Galvanised
  • Smartphone Integration
  • Steering Wheel - Multifunction Sports Steering Wheel in Nappa Leather
  • Stowage Compartment with Retractable Cover
  • Stowage Package
  • Summer Tyres
  • Surround Lighting with Projection of Brand Logo
  • THERMOTRONIC Automatic Climate Control
  • TIREFIT
  • Third Seat Row with Folding Single Seats with Isofix
  • Vehicle Set-Up and Vehicle Monitoring - 3 Years
  • Windscreen Wipers with Rain Sensor
  • Wireless Charging for Mobile Devices
Remember to check the details of this car with the dealer before you buy it to make sure that all the information is accurate.

Vehicle history check

For WF23ZTY

  • Icon - tick in circle Not recorded as stolen
  • Icon - tick in circle No third-party trace
  • Icon - tick in circle 0 previous keepers show

    The current keeper is not included in the number of previous keepers.

    This vehicle has had 1 registered keeper from new. Please note that the keeper is not necessarily the owner, it may be a company vehicle or belong to a third party.

  • Icon - tick in circle No plate changes
  • Icon - tick in circle No colour changes
  • Icon - tick in circle Mileage data not available
  • Icon - tick in circle Not an insurance write-off
Data for this history check supplied: 28/05/2025 at 09:16

What's not included?

  • Icon - cross in circle Outstanding finance details
  • Icon - cross in circle Estimated cost of vehicle ownership
  • Icon - cross in circle MOT history & common failures*
  • Icon - cross in circle Full vehicle specification
  • Icon - cross in circle Mileage discrepancies*
  • Icon - cross in circle Market valuation*
  • Icon - cross in circle Vehicle Tax Check
*Provided where available

Get peace of mind with an instant full vehicle history check and uncover any potential issues before you buy.

Get this vehicle checked

Buy with the AA

This dealer has signed up to our AA Cars Standards.

Icon - 5 stars

AA Cars Standards

Find out more about

AA Cars Standards
Icon - vehicle with spanner

Get exclusive AA offers

12 months free breakdown cover (or discounted upgrade if you're an AA member) and £75 off a Service & MOT. T&Cs apply

Activate offers

12 months free breakdown cover

  • Included with this vehicle
  • Free Accident Assist service available 24/7
  • Already with the AA? Upgrade your cover for only £10 for the year^

Unlock your offers up to six months after buying one of our vehicles.

Activate cover ^T&C's apply

Get 10% off Car Insurance

Take out a quote today and we will automatically apply 10% discount.

Get a quote today T&C's apply

Need to sell your car?

  • 5,000+ dealers compete
  • 100% free

Sell your car for a great price with our trusted partner Motorway.

Get an instant valuation

Category write-offs

A vehicle that has been in an accident will be assessed by insurance companies and assigned a category: A, B, S or N. However, we only list Cat S or N cars as Cat A and B cars are not roadworthy and safe.

Category S (formerly Category C)

The 'S' in Cat S stands for structural damage. This means the vehicle has damage to its structure/chassis, which is more than just cosmetic damage. But the vehicle can be professionally repaired, making it safe and roadworthy.

Category N (formerly Category D)

Similarly, the 'N' in Cat N stands for non-structural damage. Here, the vehicle has sustained damage, but it has not affected the structure/chassis. A Cat N car is safe to drive as the damage could be minimal/cosmetic.

Buying a written-off vehicle:

  • Do a full vehicle history check to identify category vehicles.
  • Make sure to check with the dealer if a Cat S/N vehicle has been professionally repaired.
  • Book a vehicle inspection and our experts will look over a Category vehicle for you.

Connect with us

Facebook X YouTube LinkedIn
For customers
  • Customer terms & conditions
  • Our dealers
  • Motoring advice
  • Electric cars
  • New cars
  • Car delivery
  • Why AA Cars
  • Customer data request form
For dealers
  • Car dealer terms & conditions
  • AA Cars Standards code (trade)
  • Advertise with us
Other
  • Contact us
  • About us
  • Privacy notice
  • Cookie policy
  • Sitemap
Vehicle Inspections

The AA recommends an AA Cars Vehicle Inspection before purchase. Not all cars are mechanically checked by the AA.

  • Vehicle Inspection
  • theAA.com
© AA Cars 2025  | Company No. 4546950  |  VAT No. 188 0311 10