Find a dealer
The AA
The AA
  • Used Cars
    Back Used Cars
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Audi
      • BMW
      • Citroen
      • Ford
      • Hyundai
      • Jaguar
      • Kia
      • Land Rover
      • Mercedes
      • MINI
      • Nissan
      • Peugeot
      • Porsche
      • Renault
      • Skoda
      • Toyota
      • Vauxhall
      • Volkswagen
      • Volvo
      • Browse by manufacturer
      • Search all used cars
    • Browse by Model
      Back Browse by Model
      • Audi A1
      • Audi A3
      • Audi Q5
      • BMW 3 Series
      • Fiat 500
      • Ford Fiesta
      • Ford Focus
      • Ford Kuga
      • Kia Sportage
      • Mercedes A Class
      • Mercedes C Class
      • MINI Hatch
      • Nissan Juke
      • Nissan Qashqai
      • Peugeot 208
      • Range Rover Evoque
      • Toyota Yaris
      • Vauxhall Astra
      • Vauxhall Corsa
      • Vauxhall Mokka
      • Volkswagen Golf
      • Volkswagen Polo
      • Volkswagen Tiguan
      • Search all used cars
    • Browse by Location
      Back Browse by Location
      • Birmingham
      • Bristol
      • Cardiff
      • Doncaster
      • Edinburgh
      • Glasgow
      • Hull
      • Leeds
      • Leicester
      • Liverpool
      • London
      • Manchester
      • Newcastle
      • Norwich
      • Nottingham
      • Portsmouth
      • Reading
      • Sheffield
      • Southampton
      • Swindon
      • All locations
    • Browse by Body style
      Back Browse by Body style
      • SUVs
      • 7 Seaters
      • Sports cars
      • 4x4
      • Estates
      • Hatchbacks
      • Motorhomes
      • Family cars
      • Convertibles
      • Coupes
      • Saloons
      • Luxury cars
      • People carriers
      • City cars
      • Superminis
      • Supercars
      • Executive cars
      • All bodystyles
    • Browse by Fuel type
      Back Browse by Fuel type
      • Used diesel cars
      • Used electric cars
      • Used hybrid cars
      • Used petrol cars
    • Browse by Transmission
      Back Browse by Transmission
      • Used automatic cars
      • Used manual cars
    • Browse by Maximum price
      Back Browse by Maximum price
      • Used cars under £30,000
      • Used cars under £20,000
      • Used cars under £15,000
      • Used cars under £10,000
      • Used cars under £5,000
      • Used cars under £4,000
      • Used cars under £3,000
      • Used cars under £2,000
      • Used cars under £1,000
    • Buying advice
      Back Buying advice
      • Best used 4x4 cars
      • Best used 7-seater cars
      • Best used electric cars
      • Best used estate cars
      • Best used family cars
      • Best used first cars
      • Best used fuel efficient cars
      • Best used hybrid cars
      • Best used second-hand cars
      • Best used small cars
      • Best used sports cars
      • Best used SUV cars
    • Car checks and delivery
      Back Car checks and delivery
      • Used vehicle inspection
      • Car history check
      • Vehicle delivery
  • Used Vans
    Back Used Vans
    • Browse by Manufacturer
      Back Browse by Manufacturer
      • Citroen
      • Fiat
      • Ford
      • Isuzu
      • Iveco
      • Mercedes
      • Mitsubishi
      • Nissan
      • Peugeot
      • Renault
      • Toyota
      • Vauxhall
      • Volkswagen
      • Search all used vans
    • Browse by Model
      Back Browse by Model
      • Citroen Dispatch
      • Citroen Relay
      • Ford Ranger
      • Ford Transit
      • Ford Transit Connect
      • Mercedes Sprinter
      • Mercedes Vito
      • Mitsubishi l200
      • Nissan Navara
      • Peugeot Boxer
      • Peugeot Expert
      • Peugeot Partner
      • Renault Kangoo
      • Renault Trafic
      • Toyota Hi Lux
      • Vauxhall Combo
      • Vauxhall Movano
      • Vauxhall Vivaro
      • Volkswagen Caddy
      • Volkswagen Crafter
      • Volkswagen Transporter
      • Search all used vans
    • Van checks and delivery
      Back Van checks and delivery
      • Used vehicle inspection
      • Van history check
      • Vehicle delivery
  • Finance
    Back Finance
    • Car finance
    • Car finance calculator
    • Eligibility checker
    • Car finance explained
    • PCP car finance
    • HP car finance
    • Car loans
  • Leasing
    Back Leasing
    • Car leasing
      Back Car leasing
      • All car leasing
        • Search by make
        • Fiat
        • Hyundai
        • Nissan
        • Skoda
        • Vauxhall
        • Volkswagen
        • Search by type
        • Electric
        • Hybrid
        • Automatic
        • SUV
        • Hatchback
        • Estate
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Van leasing
      Back Van leasing
      • All van leasing
        • Search by make
        • Ford
        • Mercedes
        • Nissan
        • Peugeot
        • Renault
        • Volkswagen
        • Search by type
        • Luton vans
        • Crew vans
        • Pick-up vans
        • Tipper vans
        • Dropside vans
        • High-roof vans
        • Search by price
        • Under £300
        • £300 - £400
        • £400 - £500
        • Above £500
    • Business leasing
      Back Business leasing
      • All business leasing
    • Help and guides
      Back Help and guides
        • Leasing guides
        • How AA Lease works
        • What is a car lease
        • Pros and cons of leasing
        • Common lease misbeliefs
        • Returning your lease vehicle
        • View all leasing guides
        • Help
        • FAQs
        • Contact us
  • Sell
    Back Sell
    • Sell my car
    • Sell my van
    • Value my car
  • Aftercare
    Back Aftercare
    • Car warranty
    • Breakdown cover
    • Car insurance
    • Car servicing
    • MOT
    • Car smart care
  • Advice
    Back Advice
    • Buying a used car online
    • Car reviews
    • Buyers guides
    • Best cars
    • Driving advice
  • Your account
  • Find a dealer
This car is no longer available

Other recommendations

Citroen C3 1.2 PureTech Feel Hatchback 5dr Petrol Manual Euro 6 (s/s) (83 p

Citroen C3 1.2 PureTech Feel Hatchback 5dr Petrol Manual Euro 6 (s/s) (83 p

View
£8,694
Citroen C3 PURETECH FLAIR PLUS S/S

Citroen C3 PURETECH FLAIR PLUS S/S

View
£8,700
Citroen C3 PURETECH SHINE PLUS S/S

Citroen C3 PURETECH SHINE PLUS S/S

View
£8,800
Citroen C3 PURETECH SHINE S/S

Citroen C3 PURETECH SHINE S/S

View
£10,400

Sold vehicle details

£11,272

CitroenC3 1.2 PureTech C-Series Edition (83 ps) - DIGITAL CLIMATE CONTROL

72 Citroen C3 reviews

Contact the dealer

Carsa Gloucester

01452 235 167*
View all stock at this dealer
* Calls may be recorded for training and monitoring purposes. Please refrain from providing credit/debit card information on these calls. If you do so it is at your own risk.
This dealer has committed to AA Cars Standards | tsi APPROVED CODE™ tradingstandards.uk

Overview

  • Mileage:
    20,768
  • Year:
    2023
  • Fuel type: Petrol
  • Transmission: Manual
  • Body type: Hatchback
  • Colour: Grey
  • Doors: 5
  • Engine size: 1.2 L
  • CO2 Emissions: 124 g/km

Please note: Dealers are responsible for the content of their listings and are expected to include all fees in the advertised price. You should always confirm all listing details with the dealer before purchasing.

Vehicle details

Discover the Citron C3 - a stylish grey hatchback packed with features to make every drive enjoyable. Enjoy seamless connectivity with Apple CarPlay and Bluetooth, while the LED headlights and 16in alloy wheels add a modern touch. Stay safe with Lane Departure Warning and a reversing camera, and cruise in comfort thanks to digital climate control and cruise control. Perfect for urban adventures and weekend escapes alike. 1 services recorded, last serviced on 22/05/2025 at 20,768 miles. MOT to 30/03/2026. Visit our website for service history, online valuation, full vehicle specification plus multiple images. We have over 1,800 cars available from our 10 national branches, check our website to see all our stock. Our Trustpilot rating is 4.4/5 with over 8,000 reviews.

Vehicle features

  • Apple CarPlay
  • LED Headlights
  • Reversing Camera
  • Lane Departure Warning System
  • Bluetooth
  • LED Daytime Running Lights
  • 16 inch alloys
  • Digital Climate Control
  • Air Conditioning
  • Parking Sensors
  • Auto Headlights
  • Rear Privacy Glass
  • DAB
  • USB Audio
  • Cruise Control with Speed Limiter
  • Split Folding Rear Seats
  • 2x Rear ISOFIX
  • Electric Windows
  • Android Auto
  • Voice Control
  • 1 USB Connection
  • 12V Socket
  • 16in Alloy Wheels - Matrix - Diamond Cut
  • 2-3 - 1-3 Split Folding Rear Bench
  • 3D Rear Lights Signature
  • ABS - Anti-Lock Braking System
  • Airbags - Driver
  • Airbump on Side Door Panel
  • Anodised Bronze Colour Pack
  • Anti-Theft Alarm
  • Automatic Activation of Hazard Warning Lights in case of Severe Deceleration
  • Automatic Air Conditioning
  • Automatic Door and Boot Locking when in Motion
  • Body Colour Door Handles
  • Body Colour Front and Rear Bumpers
  • Boot Light
  • C-Series Edition Carpet Mats
  • C-Series Edition Roof Sticker
  • C-Series Edition Style Pack
  • Central Locking with Locked Indicators and Interior One-Touch Lock Button
  • Chrome Decoration on Front Face - Under Chevrons and around Daytime Running Lights
  • Citroen Connect DAB Radio with 6 Speakers
  • Citroen Illuminated Signature in LED Headlights and LED Daytime Running Lights
  • Coffee Break Alert
  • Cruise Control with Speed Limiter
  • Dark Tinted - Rear Side and Tailgate Windows
  • Day-Night Switchable Interior Rear View Mirror
  • Driver and Front Seatbelts with Pyrotechnic Pretensioners and Force Limiters
  • Drivers and Passengers Sunvisor with Courtesy Mirror - Non Illuminated
  • ESP - Electronic Stability Programme with Anti-Skid System
  • Electric Child Locks
  • Electrically Adjustable - Heated Folding Door Mirrors
  • Fog Lights Integrated into the Front Bumper
  • Front Head Restraint with Height Adjustment
  • Front Lighting Panel with Map Reading Lights
  • Front Passenger Airbag - Can be Deactivated
  • Front Seats Adjustable with Forward-Back Slide and Adjustable Backrest
  • Front Sequential Electric Windows with One-Touch - Open-Close and Anti Pinch System
  • Front Side Airbags and Front and Rear Curtain Airbags
  • Height Adjustable Drivers Seat
  • Height and Reach Adjustable Steering Wheel
  • Hill Start Assist
  • ISOFIX Mountings on Outer Rear Seats with Top Tether and Labels Indicating Fixing Points
  • Instrument Cluster with White LCD and Analogue Gauges
  • LED Headlights
  • Lane Departure Warning System
  • Manual Parking Brake with Chrome Finish Button
  • Matt Black B Pillars
  • Monotone Horn
  • Multi-Function On-Board Trip Computer
  • Parcel Shelf
  • Power Assisted Steering
  • Puncture Repair Kit
  • Rear Parking Sensors
  • Rear Sequential Electric Windows with One-Touch - Open-Close and Anti Pinch System
  • Rear Windscreen Wiper with Intermittent Mode Linked to Vehicle Speed and Automatic Activation when Reverse Gear Selected
  • Remote Central Locking with Two Plip Keys
  • Reversing Camera
  • Roof - Bi-Tone - Perla Nera Black
  • Roof-Colour Rear View Mirror Caps
  • Safety Pack
  • Seatbelt Unfastened on the Move Audible and Visual Alert for Front and Rear Seats
  • Soft-Touch Gear Lever with Leather-Effect Gaiter and Overstitching
  • Soft-Touch Leather-Effect Dashboard Finish with Grey Surround
  • Standard Ambience
  • Steering Wheel with Satin Chrome Elements and Audio-Telephone Controls
  • Three Rear Seats with Headrests
  • Three Rear Three-Point Seatbelt - Outer Seats have Pretensioners and Force Limiters
  • Tyre Pressure Monitoring System
  • Upholstered Armrest in Front and Rear Doors
  • Visibility Pack
Remember to check the details of this car with the dealer before you buy it to make sure that all the information is accurate.

Vehicle history check

For CK23VLR

  • Icon - tick in circle Not recorded as stolen
  • Icon - tick in circle No third-party trace
  • Icon - tick in circle 0 previous keepers show

    The current keeper is not included in the number of previous keepers.

    This vehicle has had 1 registered keeper from new. Please note that the keeper is not necessarily the owner, it may be a company vehicle or belong to a third party.

  • Icon - tick in circle No plate changes
  • Icon - tick in circle No colour changes
  • Icon - tick in circle Mileage data not available
  • Icon - tick in circle Not an insurance write-off
Data for this history check supplied: 21/06/2025 at 09:17

What's not included?

  • Icon - cross in circle Outstanding finance details
  • Icon - cross in circle Estimated cost of vehicle ownership
  • Icon - cross in circle MOT history & common failures*
  • Icon - cross in circle Full vehicle specification
  • Icon - cross in circle Mileage discrepancies*
  • Icon - cross in circle Market valuation*
  • Icon - cross in circle Vehicle Tax Check
*Provided where available

Get peace of mind with an instant full vehicle history check and uncover any potential issues before you buy.

Get this vehicle checked

Buy with the AA

This dealer has signed up to our AA Cars Standards.

Icon - 5 stars

AA Cars Standards

Find out more about

AA Cars Standards
Icon - vehicle with spanner

Get exclusive AA offers

12 months free breakdown cover (or discounted upgrade if you're an AA member) and £75 off a Service & MOT. T&Cs apply

Activate offers

12 months free breakdown cover

  • Included with this vehicle
  • Free Accident Assist service available 24/7
  • Already with the AA? Upgrade your cover for only £10 for the year^

Unlock your offers up to six months after buying one of our vehicles.

Activate cover ^T&C's apply

Get 10% off Car Insurance

Take out a quote today and we will automatically apply 10% discount.

Get a quote today T&C's apply

Need to sell your car?

  • 5,000+ dealers compete
  • 100% free

Sell your car for a great price with our trusted partner Motorway.

Get an instant valuation

Category write-offs

A vehicle that has been in an accident will be assessed by insurance companies and assigned a category: A, B, S or N. However, we only list Cat S or N cars as Cat A and B cars are not roadworthy and safe.

Category S (formerly Category C)

The 'S' in Cat S stands for structural damage. This means the vehicle has damage to its structure/chassis, which is more than just cosmetic damage. But the vehicle can be professionally repaired, making it safe and roadworthy.

Category N (formerly Category D)

Similarly, the 'N' in Cat N stands for non-structural damage. Here, the vehicle has sustained damage, but it has not affected the structure/chassis. A Cat N car is safe to drive as the damage could be minimal/cosmetic.

Buying a written-off vehicle:

  • Do a full vehicle history check to identify category vehicles.
  • Make sure to check with the dealer if a Cat S/N vehicle has been professionally repaired.
  • Book a vehicle inspection and our experts will look over a Category vehicle for you.

Connect with us

Facebook X YouTube LinkedIn
For customers
  • Customer terms & conditions
  • Our dealers
  • Motoring advice
  • Electric cars
  • Car delivery
  • Why AA Cars
  • Customer data request form
For dealers
  • Car dealer terms & conditions
  • AA Cars Standards code (trade)
  • Advertise with us
Other
  • Contact us
  • About us
  • Privacy notice
  • Cookie policy
  • Sitemap
Vehicle Inspections

The AA recommends an AA Cars Vehicle Inspection before purchase. Not all cars are mechanically checked by the AA.

  • Vehicle Inspection
  • theAA.com
© AA Cars 2025  | Company No. 4546950  |  VAT No. 188 0311 10